A building contractor redevelops or refurbishes buildings, a developer is distinguished from a contractor in that a contractor is appointed by a client. Linham Construction Limited under the guidance of Frank Flynn is both Developer and Contractor, over the years Frank has seen many opportunities throughout Dublin to develop sites that many others would miss. Development is a very complex process. Development evaluation requires an assessment of a great number of criteria, funding can be difficult to secure, purchases and sales can take considerable time, and developments can require a great deal of management. As a result, developers require a great deal of expert knowledge in subjects such as planning, property and land valuation, building pathology, Investment appraisal, funding mechanisms, property law and planning, Design and construction.

Over the years Frank has surrounded himself with experts in new build technology in particular Passive housing. In 2017 Frank oversaw the development of five 1 bedroomed apartments specially developed for Dublin City Council to suit the elderly or the physically impaired. The apartments feature an A1 Passive design allowing for comfortable low-cost heating. Using Geocell foam glass insulation & Nilan heat recovery system While over 99% of new homes built that year in Ireland achieved at least an A3 rating, fewer than a quarter of one per cent –just 13 new homes – achieved an A1. Five of those were built by Linham Construction.

Most recently Linham developed the old 5 Lamp site, this development was 11 apartments over a ground floor retail unit, an iconic site in Dublin has been transformed into 10 one-bedroom apartments and 1 x 2 bedroom duplex apartment in a five-storey block of NZEb compliant and A1 rated. At the outset when planning the construction phase Linham with the design team considered all modern methods of construction to assess which was the best? This was necessary considering the sites extremely tight inner-city location and client requirement for fast track. It was essential to reduce the number of daily deliveries of construction material necessary to complete the build.

The method chosen resulted in one of the first apartment developments constructed in Dublin city which were manufactured using the most up-to-date off-site construction technology which was two-thirds factory based. This method of constructing dwellings is based on ensuring the smallest possible heat loss through the fabric of the building.

Major advantages of Linham are:

  • The utilisation of the latest technology.

  • Time-saving construction methods

  • Experienced Craftsmanship

  • Project Management

The Murrough Co Wicklow

Client: Wicklow County Council

Role: Main Contractor and PSCS

Client: Candle Community Trust

Role: Main Contractor and PSCS

Client: HASU Mater Hospital Dublin

Role: Main Contractor and PSCS

Client: Sallynoggin Youth & Community Facility

Role: Main Contractor and PSCS

Client: Trinity College Dublin

Role: Main Contractor and PSCS

Client: UCD (University College Dublin)

Role: Works Contractor/Works Contractor and PSCS

Client: St Teresa’s Primary School

Role: Main Contractor and PSCS

Client: St. Patrick’s Hospital

Role: Works Contractor/Works Contractor and PSCS

Client: Trinity College Dublin

Role: Works Contractor/Works Contractor and PSCS

Client: John Wickham

Role: Works Contractor and PSCS

Client: The Grafton, Royal Hiberian way Dawson Street

Role: Works Contractor/Works Contractor and PSCS

Client: Kevin Treacy

Role: Works Contractor/Works Contractor and PSCS

Client: Trinity College

Role: Works Contractor/Works Contractor and PSCS

Client: Irish College of General Practitioners

Role: Building Contractor

Client: Persion Properties

Role: Project Management

Client: Dublin City Council

Role: Development & Building Contactor

Client: Dublin City Council

Role: Development & Building Contractor

Client: Leahy & Co. Accountants

Role: Project Management & Building Contractor